Stone Technical Services Group Ltd were appointed by Gloucester Royal Hospital to carry out a risk assessment to determine the level of protection required and subsequent quotation. After our appointment we installed a Level 3 Lightning Protection System consisting of PVC aluminium tape side mounted around the perimeter of the flat roof areas with cross tapes and down conductors externally fixed to the brickwork linked to earth electrodes at ground level.
Design and colours of conductors agreed with client and installed to the specification, system fully tested and commissioned on completion.